Disaster recovery readiness checklist

Twenty checks on whether a manufacturer could resume production after losing its systems, measured in shifts rather than days.

Why run this

What this checklist is for

In a manufacturing business the recovery objective should be expressed in shifts, not days, because that is the unit in which the cost accumulates.

Most recovery plans are written by IT and describe system restoration. The useful version starts from what production needs to run and works backwards.

Run it with

Operations director and CIO jointly

And with

Infrastructure and application owners

And with

Plant management

0 of 0 complete · 0%
The checklist

20 checks, in the order we would run them

Tick only what you can genuinely evidence today. An item you intend to do is not an item you have done, and scoring yourself generously here only produces a comfortable number and an uncomfortable project.

Section 1

Objectives and dependencies

Set by the business, not by IT.

Section 2

Technical readiness

Whether the mechanism exists and functions.

Section 3

Rehearsal

The only thing that converts a plan into a capability.

Section 4

Operating during an outage

The half the plan usually omits.

What your score means

Read this against the number above

These bands are deliberately blunt. The middle band is where most organizations honestly sit, and it is a perfectly reasonable place to proceed from — provided the gaps are written down with owners rather than carried as optimism.

0–59%Significant gaps

Do not proceed yet. More than four in ten items are unaddressed, and the ones that fail here are usually the foundational ones that make everything after them harder.

60–84%Mostly ready, with known gaps

Proceed on a defined scope, with the outstanding items written into the plan as risks with owners and dates. This is the most common honest position.

85–100%Ready

The remaining gaps are small enough to handle during delivery rather than before it. Confirm the unticked items are genuinely minor rather than simply unexamined.

Your score highlights automatically as you tick items above. Nothing is saved, sent or tracked — refreshing the page clears it.

Closing the gaps

If you could not tick these, start here

The four items below are the ones whose absence causes the most trouble downstream. If your unticked items include any of these, they are worth addressing before the rest.

Objective set by IT

Get the number from operations, expressed in shifts. A technically achievable target that does not match production tolerance is the wrong target.

Never rehearsed at full scale

Schedule it. Every organization that does this properly finds a dependency nobody mapped, and finding it on a planned Saturday is cheap.

Runbooks written for the author

Rewrite for somebody tired who did not build the system. Test by having a different engineer follow one.

No declaration authority

Name the person. Late declaration is the most common cause of avoidable extended downtime.

Want a second opinion on your score?

We will assess your current position against the objectives operations actually needs, and facilitate a rehearsal with plant management present.

Talk through your result Read the related guides We reply to every message within one business day.
Keep going

Related checklists

Get In Touch

Tell us what you're trying to fix

Describe the situation in your own words.

Please enter your first name.
Please enter your last name.
Please enter a valid email address.
Please enter your company name.
Please choose an option.
Please add a short description.

We reply to every message within one business day.